Under the Freedom of Information Act 2016 the Directorate is required to have a disclosure log listing Freedom of Information requests received by the Directorate. Details of requests for personal information are not required to be reported under the act and therefore are not provided here.
The application, decision and any released documents can be viewed by clicking on the Reference Number in the table.
Previous Year (2020) | Next Year (2022)
Reference No. | Date of Application | Date of Publication | Information Requested | Decision | Date of Decision | Fees (paid or waived) | Time Spent on Application | Ombudsman or ACAT Decision (if relevant | |
---|---|---|---|---|---|---|---|---|---|
Information Given | Additional Information | ||||||||
CMTEDDFOI 2021-362 | 14 January 2022 | 16 February 2022 | Decision notices for requests for Executive Documents. | Full Release | No | 3 February 2022 | Waived | 13 working days | N/A |
CMTEDDFOI 2021-361 | 13 December 2021 | 16 February 2022 | Documents regarding the Street Theatre. | Partial Release | No | 4 February 2022 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-355 | 8 December 2021 | 14 April 2022 | Documents relating to rectification order in Bruce. | Partial Release | No | 8 February 2022 | Waived | 33 working days | N/A |
CMTEDDFOI 2021-354 | 8 December 2021 | 11 January 2022 | Documents relating to Pink Frosting between February 2019 and October 2019. | No documents found | No | 4 January 2022 | N/A | 16 working days | N/A |
CMTEDDFOI 2021-352 | 8 December 2021 | 7 February 2022 | Copy of Phase One of the legislative review, completed by Taskforce on 8 November 2021. | Refusal | No | 1 February 2022 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-346 | 6 December 2021 | 11 January 2022 | Documents produced or held by CMTEDD in relation to FOI application CMTEDDFOI 2021-257. | Partial Release | No | 4 January 2022 | Waived | 18 working days | N/A |
CMTEDDFOI 2021-343 | 30 November 2021 | 7 February 2022 | Documents regarding public release of a spreadsheet containing Workers Compensation details on Tenders ACT website. | Partial Release | No | 21 January 2022 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-341 | 30 November 2021 | 7 February 2022 | Documents relating to ACT's investments or equity related to Myanmar. | Full Release | No | 10 December 2021 | N/A | 8 working days | N/A |
CMTEDDFOI 2021-339 | 29 November 2021 | 11 January 2022 | Communication provided by the EDP to the NCA at 71 Constitution Avenue. | No documents found | No | 3 December 2021 | N/A | 4 working days | N/A |
CMTEDDFOI 2021-333 | 13 December 2021 | 14 April 2022 | Documents relating to existence and rectification in Wright. | Refusal | No | 18 February 2022 | N/A | 45 working days | N/A |
CMTEDDFOI 2021-331 Part 1 Part 2 | 14 December 2021 | 7 February 2022 | Any Ministerial briefings related to Access Canberra August 2021 to December 2021. | Partial Release | No | 14 January 2022 | Waived | 20 working days | N/A |
CMTEDDFOI 2021-330 | 22 November 2021 | 7 February 2022 | Information pertaining to unregistered vehicle permit condition. | Full Release | No | 7 December 2021 | N/A | 11 working days | N/A |
CMTEDDFOI 2021-329 | 22 November 2021 | 11 January 2022 | Complaints relating to operating a home business. | Full Release | No | 10 December 2021 | N/A | 14 working days | N/A |
CMTEDDFOI 2021-326 | 19 November 2021 | 11 January 2022 | Documents produced or held by the Secure Local Jobs Branch regarding infringements. | Full Release | No | 30 November 2021 | N/A | 7 working days | N/A |
CMTEDDFOI 2021-325 | 17 November 2021 | 13 January 2022 | Ministerial briefs related to Canberra Economic Recovery Advisory Group. | Partial Release | No | 15 December 2021 | Waived | 20 working days | N/A |
CMTEDDFOI 2021-319 | 15 November 2021 | 11 January 2022 | Correspondence between [staff] in relation to Pink Frosting from 16 November 2020 to 25 February 2021. | Partial Release | No | 8 December 2021 | Waived | 17 working days | N/A |
CMTEDDFOI 2021-318 Part 1 Part 2 Part 3 Part 4 | 15 November 2021 | 7 February 2022 | Competitive Neutrality Reports - July 2018 to July 20121. | Partial Release | No | 28 January 2022 | Waived | 50 working days | N/A |
CMTEDDFOI 2021-317 | 12 November 2021 | 7 December 2021 | Any ministerial briefs regarding set up of Better Regulation Taskforce. | Partial Release | No | 26 November 2021 | N/A | 10 working days | N/A |
CMTEDDFOI 2021-316 | 11 November 2021 | 13 January 2022 | Investigation report into hangar collapse 2003. | Full Release | No | 2 December 2021 | Waived | 15 working days | N/A |
CMTEDDFOI 2021-314 | 11 November 2021 | 13 January 2022 | Documents referring WorkSafe ACT inspection at CIT Campus Woden. | Partial Release | No | 23 December 2021 | N/A | 30 working days | N/A |
CMTEDFOI 2021-292-302 (combined) Part 1, Part 2, Part 3, Part 4, Part 6, Part 7, Part 8, Part 9, Part 10, Part 11 | 4 November 2021 | 24 November 2023 | Various records or documents relating to Secure Local Jobs approvals, decisions or notices. | Refusal | No | 19 November 2021 | N/A | 11 working days | Varied |
CMTEDDFOI 2021-290 | 3 November 2021 | 7 December 2021 | Final briefs prepared for ACT Government witnesses during Budget Estimates hearings. | Partial Release | No | 1 December 2021 | Waived | 20 working days | N/A |
CMTEDDFOI 2021-288 | 29 October 2021 | 7 December 2021 | Email correspondence sent or received by Minister Rattenbury's office relating to ACT Directly Owned Shares. | Full Release | No | 29 October 2021 | N/A | 20 working days | N/A |
CMTEDDFOI 2021-285 | 29 October 2021 | 7 December 2021 | Building approval plans submitted to Access Canberra. | Partial Release | No | 19 November 2021 | N/A | 15 working days | N/A |
CMTEDDFOI 2021-282 | 27 October 2021 | 7 December 2021 | Documents in relation to investigation of 86 Candles Pty Limited. | Refusal | No | 22 November 2021 | N/A | 18 working days | N/A |
CMTEDDFOI 2021-281 | 27 October 2021 | 30 November 2021 | Details of Access Canberra Director of Investigations. | Refusal | No | 10 November 2021 | N/A | 10 working days | N/A |
CMTEDDFOI 2021-274 | 21 October 2021 | 30 November 2021 | Research or public polling conducted by ACT Government. | Full Release | No | 18 November 2021 | Waived | 20 working days | N/A |
CMTEDDFOI 2021-272 | 15 October 2021 | 18 November 2021 | Notice of decision S62 Notice to carry out building work. | Refusal | No | 10 November 2021 | N/A | 18 working days | N/A |
CMTEDDFOI 2021-271 | 15 October 2021 | 18 November 2021 | Trip to Melbourne for Chief Minister including expenses. | Partial Release | No | 3 November 2021 | N/A | 13 working days | N/A |
CMTEDDFOI 2021-269 | 14 October 2021 | 30 November 2021 | Information related to a signed letter. | Full Release | No | 11 November 2021 | N/A | 20 working days | N/A |
CMTEDDFOI 2021-267 | 8 October 2021 | 18 November 2021 | Documentation relating to and defines what an emergency repair during Covid lockdown. | No documents found | No | 22 October 2021 | N/A | 10 working days | N/A |
CMTEDDFOI 2021-263 | 19 October 2021 | 16 March 2022 | Documents relating to petrol station leak. | Full release | Yes | 16 November 2021 | Waived | 13 working days | N/A |
CMTEDDFOI 2021-257 | 29 September 2021 | 18 November 2021 | Infringement notices issued or applicable findings relating to SLJC. | Refusal | No | 4 November 2021 | N/A | 25 working days | N/A |
CMTEDDFOI 2021-256 | 28 September 2021 | 18 November 2021 | Unimproved land value of several commercial properties. | Refusal | No | 18 October 2021 | N/A | 13 working days | N/A |
CMTEDDFOI 2021-255 | 25 September 2021 | 18 November 2021 | Development of dual occupancy and impact on existing residents. | No documents found | No | 25 October 2021 | N/A | 15 working days | N/A |
CMTEDDFOI 2021-254 | 24 September 2021 | 18 November 2021 | Investigation by Access Canberra in connection with a business. | Partial Release | No | 25 October 2021 | N/A | 20 working days | N/A |
CMTEDDFOI 2021-253 | 24 September 2021 | 18 November 2021 | Investigation conducted by Access Canberra. | Partial Release | No | 25 October 2021 | N/A | 20 working days | N/A |
CMTEDDFOI 2021-252 | 24 September 2021 | 18 November 2021 | Statement provided in LA re complaints. | Partial Release | No | 25 October 2021 | N/A | 20 working days | N/A |
CMTEDDFOI 2021-249 | 20 September 2021 | 18 November 2021 | Show cause notice issued to business in Kingston. | Full Release | No | 1 November 2021 | N/A | 29 working days | N/A |
CMTEDDFOI 2021-248 | 17 September 2021 | 18 November 2021 | Register for Community Group Accommodation. | Full Release | No | 30 September 2021 | N/A | 9 working days | N/A |
CMTEDDFOI 2021-246 | 16 September 2021 | 18 November 2021 | Community consultation regarding arboretum. | No documents found | No | 13 October 2021 | N/A | 18 working days | N/A |
CMTEDDFOI 2021-244 | 13 September 2021 | 18 November 2021 | SLJC Advisory Council review report. | Partial Release | No | 12 October 2021 | N/A | 20 working days | N/A |
CMTEDDFOI 2021-243 | 13 September 2021 | 15 November 2021 | Multiple CMTEDD Briefs. | Partial Release | No | 2 November 2021 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-235 | 6 September 2021 | 15 November 2021 | Underground fuel storage facilities. | Partial Release | No | 26 October 2021 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-233 | 6 September 2021 | 15 November 2021 | CMTEDD Briefs. | Partial Release | No | 26 October 2021 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-232 | 3 September 2021 | 15 November 2021 | ACT Govt participation in ACON's Pride in Diversity AWEI Scheme 2021. | Partial Release | No | 30 September 2021 | N/A | 19 working days | N/A |
CMTEDDFOI 2021-230 | 6 September 2021 | 15 November 2021 | Building applications for house in Hughes. | No documents found | No | 10 September 2021 | N/A | 4 working days | N/A |
CMTEDDFOI 2021-229 | 3 September 2021 | 15 November 2021 | Reports, analysis & briefs about Civic Pool redevelopment. | No documents found | No | 1 October 2021 | N/A | 20 working days | N/A |
CMTEDDFOI 2021-228 | 3 September 2021 | 15 November 2021 | WorkSafe ACT reports or complaints about unsafe working environments. | Partial Release | No | 20 October 2021 | N/A | 32 working days | N/A |
CMTEDDFOI 2021-227 | 2 September 2021 | 15 November 2021 | Minutes of meeting on 6 August 2021. | Refusal | No | 28 September 2021 | N/A | 18 working days | N/A |
CMTEDDFOI 2021-226 | 1 September 2021 | 15 November 2021 | Approvals generated by Access Canberra. | Partial Release | No | 20 October 2021 | N/A | 34 working days | N/A |
CMTEDDFOI 2021-224 Part 1 Part 2 Part 3 Part 4 Part 5 Part 6 Part 7 Part 8 Part 9 | 8 September 2021 | 15 November 2021 | Minister briefings to CM. | Partial Release | No | 28 October 2021 | Waived | 35 working days | N/A |
CMTEDDFOI 2021-220 | 24 August 2021 | 15 November 2021 | 40km/h social media documentation. | Partial Release | No | 13 October 2021 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-219 | 23 August 2021 | 12 November 2021 | SMoS Data & Digital Ministers Meeting | Partial Release | No | 26 October 2021 | N/A | 31 working days | N/A |
CMTEDDFOI 2021-217 | 20 August 2021 | 8 November 2021 | Email communication re investigation. | Refusal | No | 2 September 2021 | N/A | 9 working days | N/A |
CMTEDDFOI 2021-216 | 19 August 2021 | 12 November 2021 | Planning & Development (Plan variation no 352). | Full release | No | 10 September 2021 | N/A | 16 working days | N/A |
CMTEDDFOI 2021-213 | 15 August 2021 | 12 November 2021 | Polls & surveys since 16 May 2021. | Full Release | No | 27 August 2021 | N/A | 9 working days | N/A |
CMTEDDFOI 2021-212 Part 1 Part 2 Part 3 Part 4 Part 5 Part 6 Part 7 Part 8 Part 9 | 13 August 2021 | 9 November 2021 | EPA documents re contaminated land at Calwell. | Partial Release | No | 25 October 2021 | Waived | 50 working days | N/A |
CMTEDDFOI 2021-206 | 10 August 2021 | 12 November 2021 | Briefs on fee agreement & support organisation. | Partial release | No | 28 October 2021 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-205 | 10 August 2021 | 12 November 2021 | Surveys & public polling conducted by CMTEDD. | Full Release | No | 24 August 2021 | Waived | 10 working days | N/A |
CMTEDDFOI 2021-196 | 5 August 2021 | 12 November 2021 | CM's appearance on talkback radio. | Partial release | No | 2 September 2021 | Waived | 20 working days | N/A |
CMTEDDFOI 2021-195 | 6 September 2021 | 12 November 2021 | Documents regarding fire ignited by helicopter. | Partial Release | No | 26 October 2021 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-193 | 2 September 2021 | 12 November 2021 | Management of new 40km/h infringements. | Partial Release | No | 30 September 2021 | Waived | 20 working days | N/A |
CMTEDDFOI 2021-190 | 3 August 2021 | 12 November 2021 | COU for the National Building. | Full Release | No | 5 August 2021 | N/A | 2 working days | N/A |
CMTEDDFOI 2021-185 | 29 July 2021 | 12 November 2021 | Licence plan & RAMP for premise in Kingston. | Partial Release | No | 15 September 2021 | N/A | 34 working days | N/A |
CMTEDDFOI 2021-184 | 28 July 2021 | 12 November 2021 | Evaluation reports. | Partial Release | No | 25 August 2021 | Waived | 20 working days | N/A |
CMTEDDFOI 2021-182 | 27 July 2021 | 19 August 2021 | Data from speed cameras on the 40KPH area on Northbourne Avenue. | Full Release | No | 11 August 2021 | N/A | 11 working days | N/A |
CMTEDDFOI 2021-177 | 22 July 2021 | 19 August 2021 | Information relating to phase one and phase two of the Private Building Cladding Scheme. | Refusal | No | 5 August 2021 | Waived | 8 working days | N/A |
CMTEDDFOI 2021-171 | 14 July 2021 | 4 August 2021 | Subject line of all minister briefs from 14 June 2021 to 26 July 2021. | Partial Release | No | 26 July 2021 | N/A | 8 working days | N/A |
CMTEDDFOI 2021-167 | 9 July 2021 | 4 August 2021 | QTBs relating to the return of international students. | Full Release | No | 27 July 2021 | Waived | 12 working days | N/A |
CMTEDDFOI 2021-165 | 8 July 2021 | 18 October 2021 | Documents relating to Wilara Complex Phillip. | Refusal | No | 5 August 2021 | N/A | 10 working days | N/A |
CMTEDDFOI 2021-150 | 1 July 2021 | 4 August 2021 | Information relating to the "Amp it up" scheme. | Partial Release | No | 27 July 2021 | N/A | 18 Working days | N/A |
CMTEDDFOI 2021-146 | 23 July 2021 | 18 October 2021 | Correspondence to ACT Treasury. | Refusal | No | 23 July 2021 | N/A | 21 working days | N/A |
CMTEDDFOI 2021-145 | 29 June 2021 | 18 October 2021 | Use of logo by ACT Govt. | Partial Release | No | 16 August 2021 | N/A | 34 working days | N/A |
CMTEDDFOI 2021-140 | 23 June 2021 | 4 August 2021 | Position information for various ACT Public Service SES. | Full Release | No | 13 July 2021 | N/A | 9 working days | N/A |
CMTEDDFOI 2021-139 | 22 June 2021 | 4 August 2021 | Statistics relating to ChooseCBR. | Full Release | No | 26 July 2021 | N/A | 19 working days | N/A |
CMTEDDFOI 2021-137 Part 1 Part 2 Part 3 Part 4 Part 5 Part 6 Part 7 Part 8 Part 9 | 22 June 2021 | 18 October 2021 | Records relating to ChooseCBR voucher scheme. | Partial Release | No | 10 August 2021 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-136 | 14 July 2021 | 9 November 2021 | EPA documents re site in Calwell. | Refusal | No | 10 August 2021 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-135 | 21 June 2021 | 18 October 2021 | Applications submitted in respect of house in Hughes. | Partial release | No | 6 August 2021 | N/A | 34 working days | N/A |
CMTEDDFOI 2021-128 | 16 June 2021 | 4 August 2021 | Information relating to an address in Kambah. | Full Release | No | 19 July 2021 | N/A | 18 working days | N/A |
CMTEDDFOI 2021-127 | 14 June 2021 | 4 August 2021 | All monies paid by by CMTEDD to Communication Link. | Refusal | No Documents | 29 June 2021 | N/A | 10 working days | N/A |
CMTEDDFOI 2021-126 | 14 June 2021 | 19 August 2021 | Testing undertaken on the ChooseCBR website. | Partial Release | No | 2 August 2021 | Waived | 34 working days | |
CMTEDDFOI 2021-123 | 10 June 2021 | 4 August 2021 | Correspondence between ArtsACT and SUEZ. | Partial Release | No | 30 June 2021 | Waived | 13 working days | N/A |
CMTEDDFOI 2021-118 | 7 June 2021 | 4 August 2021 | Position information of various ACT Public Service SES. | Full Release | No | 21 June 2021 | N/A | 9 working days | N/A |
CMTEDDFOI 2021-107 | 21 July 2021 | 18 October 2021 | Economic Dev Asst Minister Briefs. | Partial Release | No | 2 September 2021 | N/A | 31 working days | N/A |
CMTEDDFOI 2021-106 | 27 May 2021 | 18 October 2021 | Tourism Ministerial Briefs. | Refusal | No | 20 August 2021 | N/A | 59 working days | N/A |
CMTEDDFOI 2021-105 | 27 May 2021 | 4 August 2021 | Economic Development minister briefs. | Full Release | No | 30 June 2021 | Waived | 22 working days | N/A |
CMTEDDFOI 2021-104 | 27 May 2021 | 4 August 2021 | Climate Action Ministerial Briefs. | Partial Release | No | 23 July 2021 | Waived | 39 working days | N/A |
CMTEDDFOI 2021-103 | 9 June 2021 | 4 August 2021 | Information relating to ACT Procurement. | Partial Release | No | 8 July 2021 | Waived | 20 working days | N/A |
CMTEDDFOI 2021-100 | 24 May 2021 | 18 October 2021 | Information on West Basin & Acton waterfront. | Partial Release | No | 28 July 2021 | Waived | 45 working days | N/A |
CMTEDDFOI 2021-095 | 19 May 2021 | 4 August 2021 | Parking infringement statistics for Kingston. | Full Release | No | 1 June 2021 | N/A | 8 working days | N/A |
CMTEDDFOI 2021-091 | 14 May 2021 | 4 August 2021 | Warning letters issued by Access Canberra. | Full Release | No | 29 June 2021 | N/A | 30 working days | N/A |
CMTEDDFOI 2021-090 | 13 May 2021 | 4 August 2021 | Tender process for CIT in 2017. | Partial Release | No | 28 June 2021 | N/A | 30 working days | N/A |
CMTEDDFOI 2021-088 | 13 May 2021 | 4 August 2021 | Asbestos removal reports. | Partial Release | No | 30 June 2021 | N/A | 32 working days | N/A |
CMTEDDFOI 2021-084 | 11 April 2021 | 3 June 2021 | Copies of all reports for the following projects: 2017.22501.330 | Refusal | No Documents | 14 May 2021 | N/A | 3 working days | N/A |
CMTEDDFOI 2021-082 | 11 May 2021 | 4 August 2021 | EPA Complaints. | Partial Release | No | 29 June 2021 | N/A | 33 working days | N/A |
CMTEDDFOI 2021-080 | 7 May 2021 | 4 August 2021 | Position information of various ACT Public Service SES. | Full Release | No | 3 June 2021 | N/A | 18 working days | N/A |
CMTEDDFOI 2021-079 | 7 May 2021 | 6 July 2021 | Notices from EPA regarding groundwater contamination. | Partial Release | No | 6 July 2021 | N/A | 40 working days | N/A |
CMTEDDFOI 2021-077 | 6 May 2021 | 3 June 2021 | Incident report regarding fallen gum trees in February 2021. | Refusal | No Documents | 19 May 2021 | N/A | 9 working days | N/A |
CMTEDDFOI 2021-076 | 5 May 2021 | 4 August 2021 | Any enforcement action from Access Canberra relating to a builder. | Refusal | No Documents | 24 May 2021 | N/A | 40 working days | N/A |
CMTEDDFOI 2021-073 | 30 April 2021 | 4 August 2021 | Statistics from ACT Revenue. | Refusal | No Documents | 21 May 2021 | N/A | 13 working days | N/A |
CMTEDDFOI 2021-071 | 29 April 2021 | 4 August 2021 | Record of successful claim payments made by the ACT Master Builders Fidelity Fund. | Partial Release | No | 21 June 2021 | N/A | 35 working days | N/A |
CMTEDDFOI 2021-070 | 28 April 2021 | 3 June 2021 | Information relating to a construction project. | Refusal | No Documents | 12 May 2021 | N/A | 10 working days | N/A |
CMTEDDFOI 2021-060 | 13 April 2021 | 4 August 2021 | System errors for traffic camera between February 2020 to March 2020. | Full Release | No | 3 June 2021 | N/A | 35 working days | N/A |
CMTEDFOI 2021-053 | 29 March 2021 | 3 June 2021 | Reports relating to the Eastern duplication construction bridge collapse. | Full Release | No | 19 May 2021 | Waived | 34 working days | N/A |
CMTEDDFOI 2021-052 | 30 March 2021 | 4 August 2021 | Earthing study by Transgrid to UTR. | Partial Release | No | 13 May 2021 | Waived | 29 working days | N/A |
CMTEDDFOI 2021-050 | 23 March 2021 | 28 April 2021 | Documents in relation to the safety concerns at the Gungahlin Leisure Centre (GLC) from July 2019 to March 2021. | Partial Release | No | 07 April 2021 | Waived | 9 working days | N/A |
18 March 2021 | 28 April 2021 | Decisions made by the Environment Protection Authority (EPA) in relation to development. | Partial Release | No | 09 April 2021 | Waived | 14 working days | N/A | |
CMTEDDFOI 2021-045 | 15 March 2021 | 4 August 2021 | Lead dust within the Old Bus Depot Markets. | Partial Release | No | 24 May 2021` | Waived | 47 working days | N/A |
CMTEDDFOI 2021-031 | 22 February 2021 | 9 April 2021 | Information relating to training for crystalline silica dust awareness. | Partial Release | No | 22 March 2021 | N/A | 19 working days | N/A |
CMTEDDFOI 2021-030 | 22 February 2021 | 3 June 2021 | All documents relating to the amendments made in 2020 to the Work Health and Safty Act 2011. | Partial Release | No | 21 April 2021 | Waived | 39 working days | N/A |
CMTEDDFOI 2021-027 | 18 February 2021 | 9 April 2021 | Communications between the ACT government's economic development directorate regarding the pool at the Gungahlin Leisure Centre. | No documents found | No | 22 February 2021 | N/A | 2 working days | N/A |
CMTEDDFOI 2021-023 | 15 February 2021 | 4 August 2021 | Gungahlin Leisure Centre and its pools, in particular the issues with the 50 metre pool. | Partial Release | No | 19 April 2021 | N/A | 47 working days | N/A |
CMTEDDFOI 2021-019 | 9 February 2021 | 9 April 2021 | Skilled Visa Nominations For years 2019 and 2020. | Full Release | No | 15 February 2021 | N/A | 4 working days | N/A |
CMTEDDFOI 2021-016 | 1 February 2021 | 9 April 2021 | Information request relating to several applications for outdoor dining. | Partial Release | No | 19 March 2021 | N/A | 33 working days | N/A |
CMTEDDFOI 2021-013 | 26 January 2021 | 9 April 2021 | Details regarding the installation dates of cameras and related signage. | Full Release | No | 16 March 2021 | N/A | 14 working days | N/A |
CMTEDDFOI 2021-010 | 22 January 2021 | 9 April 2021 | Correspondence between the Chief Minister's office and the Australian National University regarding the return of students for 2021. | No documents found | No | 15 March 2021 | N/A | 34 working days | N/A |
CMTEDDFOI 2021-009 | 20 January 2021 | 1 April 2021 | The budget spent and/or proposed & availability of smart badges in the ACT. | Full Release | No | 11 February 2021 | N/A | 15 working days | N/A |
CMTEDDFOI 2021-008 | 19 January 2021 | 29 March 2021 | Noise complaints registered at the EPA. | Full Release | No | 27 January 2021 | N/A | 5 working days | N/A |
CMTEDDFOI 2021-007 | 18 January 2021 | 28 April 2021 | Building approval plans for Fadden Section 329 Block 13. | Partial Release | No | 10 March 2021 | Waived | 35 working days | N/A |
CMTEDDFOI 2021-004 | 12 January 2021 | 24 February 2021 | Claim from injury in 2019. | No documents found | No | 19 January 2021 | N/A | 5 working days | N/A |
Previous Year (2020) | Next Year (2022)
To view access decisions made under Freedom of Information Act 1989, please visit the Open Government website.
Ombudsman Review
Anybody may request the Ombudsman review a decision where it was determined:
- the information was not held by the Directorate;
- not to give access to the information as releasing it would be contrary to the public interest; or
- refused to confirm or deny that the information is held by the Directorate.
Additionally where the Directorate refuses to deal with an application the applicant or a person whose interests are affected can appeal to the Ombudsman, and any relevant third party may appeal to the Ombudsman about a decision to release information.
The Ombudsman can confirm a decision, vary a decision, or set aside a decision and make a substitute decision.
The contact details for the ACT Ombudsman are:
ACT Ombudsman
GPO Box 442
CANBERRA ACT 2601
Complaints: 1300 362 072
Email: actfoi@ombudsman.gov.au
Website: http://ombudsman.act.gov.au/